honda305 Home honda305 Auctions honda305 Gallery honda305 Forum


honda305.com Forum

Login
□ Search
□ FAQ 
□ 
Vintage Honda Owners,
Restorers, Riders and
Admirers

1961 CB72 Project

Want to keep a Restoration Log? Post it here! You can include photos. Suggested format: One Restoration per Thread; then keep adding your updates to the same thread...
User avatar
G-Man
honda305.com Member
Posts: 5678
Joined: Wed Mar 25, 2009 5:17 pm
Location: Derby, UK
Contact:

Post by G-Man » Mon Mar 09, 2015 3:27 pm

While I am waiting for the piece of ground steel bar I need to finish the crank jig I thought that I would have a go with the little big-end roller lapping tool that I made. I bought a large volume of 2.5mm rollers but they are a tad too long at 13.8mm compared with the Honda rollers at 13.5mm.

Image

The rollers are loaded into the tool then it is inverted and applied to very fine abrasive paper on a smooth surface. Once half the material is removed the rollers are emptied out, turned over and the process repeated. After around 10-15 minutes the rollers all fitted nicely in my cage.

Image

Just to make sure that all was OK a set of rollers was greased and loaded into the cage in one of my rods.

Image

This was much simpler to do than I expected and much, much cheaper than trying to use those almost unobtainable Honda rollers.

If I am going to re-use these rods, I will have to sort out the small ends. The bore looks like it has had a hard life and I am going to experiment with putting a bronze bush in the eye. A lot easier job to do when the rods are off the crank.

Image

G
'60 C77 '60 C72 '62 C72 Dream '63 CL72
'61 CB72 '64 CB77 '65 CB160
'66 Matchless 350 '67 CL77
'67 S90 '77 CB400F

alan curtis
honda305.com Member
Posts: 207
Joined: Tue Sep 23, 2008 1:40 pm
Location: worcester. uk

Post by alan curtis » Mon Mar 09, 2015 5:03 pm

Graham, you are bringing new levels to the home workshop, I am amazed at what you are turning out. fantastic pics, top job. thanks for your help...

User avatar
G-Man
honda305.com Member
Posts: 5678
Joined: Wed Mar 25, 2009 5:17 pm
Location: Derby, UK
Contact:

Post by G-Man » Mon Mar 09, 2015 5:10 pm

Alan

Thanks! There are plenty of knowledgeable and helpful people on this forum and I have learned from many. I am just adding to the pool and having some fun in the process....

I'm just an enthusiastic amateur trying to avoid becoming an unenthusiastic professional. :-)

G
'60 C77 '60 C72 '62 C72 Dream '63 CL72
'61 CB72 '64 CB77 '65 CB160
'66 Matchless 350 '67 CL77
'67 S90 '77 CB400F

User avatar
G-Man
honda305.com Member
Posts: 5678
Joined: Wed Mar 25, 2009 5:17 pm
Location: Derby, UK
Contact:

Post by G-Man » Wed Mar 11, 2015 2:38 pm

The last piece of my jig 'jigsaw' arrived and I was able to check alignment and move on to the next part.

Image

Just need to shorten those columns and make the part which will index the timing sprocket. There are 16 teeth on the crank sprocket which means that there will be a corresponding tooth at 90 degree intervals.

In the pic of this crank the sprocket tooth lines up nicely with the crankpin but I will pick up one of the teeth at 90 degrees to this on my fixture to make getting the pin in easier.

Image


Getting slowly closer.......

G
'60 C77 '60 C72 '62 C72 Dream '63 CL72
'61 CB72 '64 CB77 '65 CB160
'66 Matchless 350 '67 CL77
'67 S90 '77 CB400F

User avatar
G-Man
honda305.com Member
Posts: 5678
Joined: Wed Mar 25, 2009 5:17 pm
Location: Derby, UK
Contact:

Post by G-Man » Sat Mar 14, 2015 1:53 pm

Back in the workshop today, making the indexing part of the fixture. This part is made from two pieces of aluminium bolted together before boring the major holes. This is because it will be trapped on the crankshaft once the wheels are pressed back onto the centre section.

Image

The big hole in the centre has to accommodate both the sprocket and the oil pump gear, both different diameters to make life a little more interesting.

To index the sprocket, I made a little pin from an M6 bolt and filed it to make it fit the space between two sprocket teeth.

Image

Because I opted to go between the teeth rather than pick up one of the teeth, my pin is offset 11.25 degrees (½ a tooth). This keeps the actual point of the tooth set at Top Dead Centre.

Image

And here is another trial assembly of the pieces

Image

Still a couple of jobs to do before I can put the crank back together. The thickness of this piece needs trimming a little as it is wider than the available space between the bearings.

I have to make some new plugs to block up the big end oil galleries and the small ends in the rods need sorting.

G
'60 C77 '60 C72 '62 C72 Dream '63 CL72
'61 CB72 '64 CB77 '65 CB160
'66 Matchless 350 '67 CL77
'67 S90 '77 CB400F

User avatar
sarals
honda305.com Member
Posts: 1014
Joined: Mon Jun 25, 2012 9:19 pm
Location: Monterey Peninsula, California

Post by sarals » Sat Mar 14, 2015 4:03 pm

Good stuff, Graham! It's really fun to watch a master machinist at work. Clever ideas, simple approach, I am in awe!
1965 CB77 305 Super Hawk
1989 NT650 Hawk GT
1981 Yamaha XJ550 Seca

jerry
honda305.com Member
Posts: 173
Joined: Tue Feb 19, 2008 2:33 pm
Location: australia

Post by jerry » Sat Mar 14, 2015 4:12 pm

"On Ya G Man." I like that you are using your most valuable asset. I wish more would do the same. All the best Jerry

Post Reply




 

CB-77 | CYP-77 | Road Test | Riding Log | Literature | Zen | Marketplace | VJ Survey | Links | Home